Skip to content

Pre-launch preview: nothing is live yet. The demo uses sample data to show how it is planned to work. Try the live demo

Guide

Staged invoicing for drafting jobs

A residential drafting job can run for months between the first site visit and the last set of construction drawings. Invoicing in stages, with a clear trigger for each, keeps cash coming in and keeps scope conversations short.

Try the live demoJoin the waitlist3 min read · Updated

Why stage your invoices

  • Cash flow. You are paid as work is delivered, not months later.
  • Lower risk. If a project stalls at council, you have already been paid for the work done.
  • Clearer scope. Each stage has its own deliverables, so “is that included?” has an answer.
  • Client comfort. Smaller, predictable payments are easier for homeowners to approve than one large bill.

A typical stage structure

Example structure for a residential job (adjust to your practice)
StageDeliverablePayment trigger
Booking / measure-upSite measure, existing conditions drawingsOn acceptance of the proposal
ConceptSketch plans, one or two optionsClient selects an option
Planning drawingsDrawings and reports for the planning applicationDrawings issued for lodgement
Working drawingsConstruction documentation for building approvalDrawings issued to the certifier
Post-approvalResponses, minor amendments, builder queriesMonthly, as used

Choosing good triggers

A good trigger is something you control and can prove. “Drawings issued for lodgement” is a good trigger; “planning permit granted” is not, because it depends on the council and can take months.

Avoid triggers that depend on the client’s approval with no deadline. If you need the client’s sign-off, say what happens if they don’t respond, for example that the stage is treated as accepted after a set number of business days.

Revision allowances

Most drafting disputes are really revision disputes. State how many rounds of changes each stage includes, and what a “round” is: a single consolidated list of changes from the client, returned once.

When a round is used up, raise a variation: a short description, a price or hourly rate, and the client’s approval before you start. In a staged schedule a variation simply becomes an extra line on the stage it affects.

A worked example

ExampleExample: a single-storey extension (sample figures)
Booking and measure-up: on acceptance
A$1,100
Concept, 2 revision rounds: on option selected
A$1,650
Planning drawings: on issue for lodgement
A$2,200
Variation: third round of planning changes
A$330
Working drawings: on issue to certifier
A$2,750

Illustrative only, GST-inclusive. Total A$8,030 across five invoices instead of one.

Stages with consultants

When engineers, surveyors or energy assessors are part of the job, attach their fees to the stage their work is delivered in, so the stage invoice reflects what was delivered. That is the basis of a split payment. For each consultant, decide whether they supply the client directly or supply you; it changes who invoices and who charges GST (GST guide).

Records that help later

Keep the accepted proposal, each stage invoice, the date the trigger was met and each variation approval together. If a payment is ever disputed, those records are what you rely on, and in some states statutory payment schemes may apply (security of payment basics).

DrafterShare is being built around exactly this structure: stages, triggers, revision allowances and variations on one schedule. It is pre-launch; see it in the live demo or read the drafter’s view.

Questions

Should I take a deposit on a drafting job?

Many practices invoice a booking or measure-up stage on acceptance, which works like a deposit tied to real work. Whatever you choose, put it in the proposal.

How many revision rounds should a stage include?

There is no standard number. One or two consolidated rounds per design stage is common; what matters is that the number is written down and the client knows what happens after it.

Can a stage be paid in instalments?

Yes, a large stage can be split into, for example, 50% on start and 50% on issue. Each part then needs its own trigger.

Help shape it before launch

We are looking for a small group of Australian design practices and consultants to pilot this on one or two real projects.